How Long Does a Home Renovation Typically Take?

by | Sep 28, 2025 | Blog, Home Renovations

Table of Contents

  1. Introduction
  2. Why Renovation Timelines Matter
  3. Factors That Influence Renovation Duration
    • 3.1 Size of the Project
    • 3.2 Type of Renovation
    • 3.3 Permits and Approvals
    • 3.4 Contractor Availability
    • 3.5 Supply Chain & Material Delays
    • 3.6 Unexpected Issues
  4. Average Timelines for Different Renovation Projects
    • 4.1 Kitchen Renovation
    • 4.2 Bathroom Renovation
    • 4.3 Basement Finishing
    • 4.4 Home Additions & Extensions
    • 4.5 Full Home Remodeling
    • 4.6 Exterior Renovations (Roofing, Landscaping, Siding)
  5. The Role of Permits in Toronto and GTA Renovations
  6. Timeline for Custom Home Builds
  7. Renovation Timeline by GTA Location
    • Toronto
    • Markham
    • Vaughan
    • Mississauga
    • North York
    • Scarborough
    • Richmond Hill
  8. Tips for Staying on Schedule
  9. Common Delays and How to Avoid Them
  10. Working With a Professional Toronto Contractor
  11. Frequently Asked Questions (FAQs)
  12. Conclusion

Introduction

When planning a home renovation in Toronto or the GTA, one of the most common questions homeowners ask is: “How long will it take?”

The timeline for a home renovation depends on the project’s scale, complexity, and even the neighborhood you live in. For instance, a kitchen remodel in Markham may take 6–8 weeks, while a full home addition in North York could last 4–6 months.

At David Reno, a leading Toronto contractor specializing in full-scale home remodeling, additions, and custom builds, we help homeowners navigate not only the renovation process but also the timeline expectations. This guide explores everything you need to know about how long renovations take, what affects the schedule, and how to keep your project on track.


Why Renovation Timelines Matter

  • Budget Planning: Extended timelines can increase labor and temporary housing costs.
  • Family Planning: Helps you prepare for disruptions in daily living.
  • Resale Timing: Important if renovating before listing your home.
  • Peace of Mind: Avoids frustration by setting realistic expectations.

Factors That Influence Renovation Duration

3.1 Size of the Project

Small renovations (like a bathroom refresh) may take just a few weeks, while large-scale remodels can stretch into months.

3.2 Type of Renovation

Structural work, plumbing, and electrical upgrades always add time.

3.3 Permits and Approvals

Toronto’s permit process can add weeks or months, especially for home additions or extensions.

3.4 Contractor Availability

High demand in Toronto, Mississauga, and Vaughan can impact scheduling.

3.5 Supply Chain & Material Delays

Imported materials like custom tiles, specialty flooring, or cabinetry can delay timelines.

3.6 Unexpected Issues

Hidden mold, asbestos, foundation cracks, or outdated wiring may require extra work.


Average Timelines for Different Renovation Projects

4.1 Kitchen Renovation

  • Timeline: 6–12 weeks
  • Tasks: Demolition, plumbing/electrical, flooring, cabinetry, counters, backsplash, appliances.

4.2 Bathroom Renovation

  • Timeline: 4–8 weeks
  • Tasks: Waterproofing, plumbing, tiling, vanity installation, fixtures.

4.3 Basement Finishing

  • Timeline: 6–12 weeks
  • Tasks: Framing, drywall, flooring, bathrooms, electrical, insulation.

4.4 Home Additions & Extensions

  • Timeline: 4–8 months
  • Tasks: Permits, foundation, framing, structural work, utilities, finishes.

4.5 Full Home Remodeling

  • Timeline: 6–12 months (depending on scope)
  • Tasks: Entire house upgrades, including kitchens, bathrooms, flooring, electrical, roofing.

4.6 Exterior Renovations (Roofing, Landscaping, Siding)

  • Timeline: 1–3 months
  • Tasks: Roofing replacements, exterior cladding, landscaping, decks, patios.

The Role of Permits in Toronto and GTA Renovations

get renovation permit fast

Securing permits adds 2–16 weeks depending on project size. For example:

  • Decks & Small Additions: 2–4 weeks
  • Basements & Medium Projects: 4–8 weeks
  • Large Additions/Custom Homes: 12–16+ weeks

Working with a contractor like David Reno ensures smooth submission and approval.


Timeline for Custom Home Builds

Building a custom home in Toronto or the GTA is a long-term project:

  • Planning & Permits: 3–6 months
  • Construction: 10–16 months
  • Total: 1.5–2 years from idea to completion

Renovation Timeline by GTA Location

  • Toronto: Longer permit approvals due to high demand.
  • Markham: Faster process, but strict on heritage zones.
  • Vaughan: Large additions require stormwater approvals.
  • Mississauga: Secondary suites need zoning clearance.
  • North York: Busy with custom builds; longer waits.
  • Scarborough: Older homes may need extra electrical upgrades.
  • Richmond Hill: Strict on lot coverage for additions.

Tips for Staying on Schedule

  • Hire an experienced Toronto contractor
  • Finalize design before construction begins
  • Order materials early
  • Be flexible with finishes (to avoid backorders)
  • Prepare for inspections promptly

Common Delays and How to Avoid Them

  • Permit Delays: Submit complete, accurate applications.
  • Design Changes: Stick to your plan once construction begins.
  • Material Shortages: Choose readily available options.
  • Weather: Winter and rainy seasons can delay exterior projects.

Working With a Professional Toronto Contractor

At David Reno, we:

  • Provide accurate project timelines upfront
  • Manage permit applications
  • Coordinate material sourcing
  • Keep projects on track with experienced crews
  • Minimize disruption to your family

Frequently Asked Questions (FAQs)

Q1: Can I speed up my renovation?
Yes, by finalizing design early, hiring experienced contractors, and avoiding scope changes.

Q2: What renovation takes the longest?
Full home remodels and home additions.

Q3: How do holidays impact timelines?
Contractors and suppliers may close, extending project duration.

Q4: Do smaller cities like Markham or Vaughan have faster permits than Toronto?
Yes, typically less backlog compared to Toronto.

Q5: Should I move out during a renovation?
For large-scale remodels, moving out short-term is often recommended.


Conclusion

Every renovation project is unique, but understanding average timelines helps homeowners prepare. From a 6-week bathroom renovation to a 6-month home addition, planning ahead avoids surprises.